Commit Graph
9 Commits
Author SHA1 Message Date
windyboy 27fe9c078e docs: archive historical planning documents and fix references
Move self-described historical/upstream docs to docs/archive/:
- agent-runbook-guide.md
- lan-core-switch-upgrade-plan.md
- lan-rb5009-upgrade.md
- se5420-review-claim-verification-2026-08.md

Update archive/README.md manifest and fix relative links in active docs
and archived docs. Update AGENTS.md docs/ layout description.
2026-08-22 19:34:05 +08:00
windyboy e5819eeba3 docs: correct hass hardware to x88 Pro physical box; sync CSG v1.3.2
- hass.windy.lan is a physical x88 Pro box (HAOS bare-metal, machine: green,
  CPE x88pro20, virtualization empty) — not PVE VM 180 (verified live 2026-08-18)
- Record CSG v1.3.2 (934f58c, W1N-118) deploy in maintenance runbook verify
  section and hosts live-tree section (backups now include w1n118)
2026-08-18 13:32:33 +08:00
windyboy 562de68127 docs: record VLAN10 live verification (DHCP lease, NAT counters, isolation) 2026-08-11 19:36:20 +08:00
windyboy 86bfb5a953 docs: record SE5420 VLAN10 deployment pitfalls (trunk PVID, fw4 dest=lan, minimal gfw migration) 2026-08-11 19:22:22 +08:00
windyboy 3ec51299cc docs: note VLAN1 undeletable on SE5420; disable unused ports first 2026-08-11 13:13:33 +08:00
windyboy 7a54e8d9ec docs: align SE5420 guide with actual Chinese GUI menus and port layout 2026-08-11 12:59:46 +08:00
windyboy 7b4c48eb93 docs: refine SE5420 upgrade guide into granular step-by-step ops 2026-08-11 11:07:25 +08:00
windyboy ffb37a916e docs: finalize SE5420 deployment guide per review
- Reorder §3.3: create VLAN66/55 before SVI; keep VLAN1 until management path verified
- Fix §3.4 verification port wording (enabled VLAN66 access port, e.g. port 6)
- Harden VLAN10 phase: PVE boundary, gfw NAT/IPv6 policy, rollback order, verification chain
2026-08-10 11:00:28 +08:00
windyboy 35577d0c5c docs: add SE5420 core-switch deployment plans; note PVE VM topology 2026-08-09 21:22:02 +08:00